§ 8-2-41. Connection required.  


Latest version.
  • (a)

    Connection to city water and sewer mains are to be made within 30 days. Within 30 days from the time water and/or sewer mains are completed and ready for use, the abutting property owners shall cause such property to be connected to both water and/or sewer mains. If both water and sewer are available the property owner must connect to both at the time of connection, provided that the property owner is notified, in writing, of the installation of said mains. The property owner shall have 30 days after such notification to make the connection. At the time a water connection is made to the city water system all cross-connections as defined in section 8-2-34 shall be disconnected. Under no conditions will interconnected dual water supply systems be permitted. This requirement may be waived by the director of public services department if, in his opinion, a health condition does not require immediate hookup.

(Ord. No. 87-31, 4-16-87; Ord. No. 97-102(2); § 1(5), 12-18-97)